Saetech was contracted by the main contruction company (Dura Vermeer) as independent party to review documentation as provided by the heavy lift contractor (ALE Heavylift). The scope of Saetech was to check and confirm the barge stability & structures during the jacking, SPMT transportation, load-out & installation of the Boekelose brug.