1921 – Offshore gangway

Saetech was contracted by Tenwolde to check the capacity of existing modular gangways. The existing construction was capable up to 30m length. For this particular project, the length was to be increased to 40m. For this project, new modular adapters and modified support frames were to be designed as well.

Translate »