2139 Removal of Lekbrug in Vianen, Verification for Mammoet

Saetech performed an independent 3rd party review for Mammoet, to verify the design & calculations for the removal of the Lekbrug, the Iron Lady, in Vianen. Saetech was closely involved during the whole project, and made a detailed FE model to check and confirm the complete system stability.
Translate »