Saetech was contracted by Mammoet to design a transport- and lifting frame for the 1 Bedroom Water Villas and 2 Bedroom Water Villas of the Red Sea project. The frames were used to safely transport the villas by SPMT and by sea and to install the Villas on there foundation by crane barge.