1941-01 Transport & Lifting Trestles

Saetech was contracted by G. O’Brien and Kiernan Structural Steel Ltd. to check and confirm the structural integrity of various frames for the transport and installation on-site. The frames were checked to be transported on SPMTs and lifted by multiple lifting points using the (by Saetech designed) modular spreader system.

Translate »