Saetech was contracted via SIF by Van Oord to design lifting points and beamstoupend a Transition Piece (TP).
The lifting points are project specific designed to carry the weight of the TP of 426 tonnes.
The upending was successfully carried out bythe team of SIF at the Maasvlakte 2, using two 500t mobile cranes for upending and the LR11350 for lifting.