2006 Wolbecker bridge support engineering

Saetech was contracted by Montec to design the supports underneath the arches during the construction of the Wolbecker road bridge. The design was made to be able to construct the bridge in smaller parts, reducing the size of the construction parts that need to be handled and lifted. A jacking device was designed on top of the supports for the fitting & alignment of the arches.

Translate »