2014 – Design transport frame wind turbine towers

Design of transport frame for wind turbine towers

Saetech was contracted by Van Der Kruijssen Verticaal Transport to design, calculate and fabricate a tower transport frame. The transport frame is designed in such way that various sections of the wind turbine can be transported in upright position, on multiple type of modular trailers; which ensures maximum flexibility for Enercon.

1827 – Lifting study machine replacement

Saetech was contracted by Dior Heavylift to collectively design a method to replace a dry mill in a factory in France. The method following from thestudy was an out-of-the-box idea, which can save the client a lot of time, since a lot of machinerycanremain in position, compared to the other solutions.

1947 – TP Upending tools & beams

Design and engineering of Lifting tool & upending beam for TP

Saetech was contracted via SIF by Van Oord to design lifting points and beamstoupend a Transition Piece (TP).

The lifting points are project specific designed to carry the weight of the TP of 426 tonnes.

The upending was successfully carried out bythe team of SIF at the Maasvlakte 2, using two 500t mobile cranes for upending and the LR11350 for lifting.

1932-02 – Offshore A-frame gantry

Saetech was contracted by Conbit to design an A-frame (partly) using available equipment, for the offshore installation of additional piping on an offshore platform.

Structural checks were carried out, as well as detailed 3D design of the support frames & mast heads of the A-frame.